Cellar Floor

Leave a comment

Placing 6” of crushed stone for drainage underneath concrete floor. Note plastic under piers lapping on top of stone for vapor barrier.

Finishing the final leveling of stone with laser.

Entire waste pile to date, mostly to be reused and recycled.

Installing two layers of EPS foam under basement floor.

Note layer of black 6 mil poly installed between double 2” layer of EPS foam, complete vapor barrier to over pier and footing.

 Finished basement floor insulation ready for concrete.

 Finished basement floor insulation ready for concrete.

Author: kikamca

Traveling with Steve to San Francisco to the International Association of Laryngectomees Annual Meeting and Voice Conference!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s