Progress and Solar Panels

House roof framing, ladder overhangs, and trenching for power.

Setting the power transformer base in 2’ of stone.

Insulating the garage walls with thermax.

Installation of PV solar collectors.

22” wide pine boards arriving from being kiln dried to 5 percent. To be used for flooring, walls paneling and trim.

T/G paneling acclimating to be installed on entire upstairs ceilings.

Solar panels complete. 36 PV and 2 hot water. Online on Monday Oct. 5.

Drilling the well.

South side with windows and doors installed and house wrap.