House roof framing, ladder overhangs, and trenching for power.

Setting the power transformer base in 2’ of stone.

Insulating the garage walls with thermax.

Installation of PV solar collectors.

22” wide pine boards arriving from being kiln dried to 5 percent. To be used for flooring, walls paneling and trim.

T/G paneling acclimating to be installed on entire upstairs ceilings.

Solar panels complete. 36 PV and 2 hot water. Online on Monday Oct. 5.

Drilling the well.

South side with windows and doors installed and house wrap.

Author: kikamca

Traveling with Steve to San Francisco to the International Association of Laryngectomees Annual Meeting and Voice Conference!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s