Air recovery ducts sealed and OSB sub-blocking where vent holes come through ceilings or walls.

Sea of home run wires eventually to be connected to electric panel.

Data, speaker, telephone and cable, home run wires

First floor main dividing wall filled with wiring and plumbing

Installing Vermont slate in handicap accessible powder room.

Nail plates on every wire and pipe penetration.

All drainage is ABS plumbing pipe.

Interior of master bath custom tile shower underway.

Pitched tile sill and tile jam returns into bathroom window.

Sealed supply and return heat recovery ducts.

Morning light entering main floor.

Custom granite sills for 13” deep window walls.

Exterior siding progress.

Author: kikamca

Traveling with Steve to San Francisco to the International Association of Laryngectomees Annual Meeting and Voice Conference!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s